Project
MR

Ask the Project Riverside Medical Center, Tower B

Ready. I've indexed the spec book, plumbing drawings (P-series), addenda 1 through 3, and 42 approved submittals for this project. Ask me anything about the job, or tap a question below.

Indexed for this project

  • PDF
    Project Manual Vol. 2
    Div 22 Plumbing, 184 pp
    Indexed
  • DWG
    P-Series Drawings
    P-001 to P-612, Rev 4
    Indexed
  • ADD
    Addenda 1–3
    Latest: Add. 3, Oct 14
    Indexed
  • SUB
    Approved Submittals
    42 items
    Indexed
  • RFI
    RFI Log
    117 RFIs, 9 open
    Syncing

Jurisdiction

Adopted code: 2021 IPC with state amendments
AHJ: City Building Dept., Plumbing Division
Medical gas: NFPA 99 (2021)

Code Lookup

How answers are sourced

Answers cite the code section and, where the project specs are stricter, the spec paragraph that governs. Local amendments are flagged separately.

Code text is summarized, not reproduced. Tap a citation to open the official source.

Final interpretation rests with the engineer of record and the AHJ inspector.

Photo Check

Take a photo or drop one here
Add a note like "is this hanger spacing OK?" or just send the photo.
Or try a sample from the job:

What it checks

  • Hanger and support spacing vs. spec and code
  • Slope and direction on drainage runs
  • Cleanout placement and access
  • Backflow and cross-connection risks
  • Fire-stopping at penetrations
  • Match to the drawing detail for that location

Project Documents

DocumentTypeRevisionUpdatedStatus
Project Manual Vol. 2, Div 22SpecCD SetAug 2Indexed
Addendum 3Addendum—Oct 14Indexed
P-401 Plumbing Plan, Level 4DrawingRev 4Oct 14Indexed
P-501 Riser DiagramsDrawingRev 3Sep 30Indexed
P-601 DetailsDrawingRev 4Oct 14Indexed
Submittal 22 11 16-02 Copper Pipe & FittingsSubmittalApprovedSep 3Indexed
Submittal 22 05 29-01 Hangers & SupportsSubmittalApproved as notedSep 9Indexed
RFI Log exportRFI—TodaySyncing